Lean Six Sigma in Procurement / Supply Management

Lean Six Sigma in Procurement / Supply Management

Lean Six Sigma in Procurement / Supply Management: Why It Matters

Procurement moves cash, inventory, and supplier quality. When hand-offs drag or data is fuzzy, costs spike and plants wait. Lean removes wasted steps; Six Sigma removes variation.

  • Lead-time down 33 % — a project cut PO creation from three days to two days. – dcmlearning.ie
  • Savings up US $9.6 M per quarter — a sourcing group freed 4.5 FTEs for strategic work. – isixsigma.com
  • Invoice defects down 94 % at a Fortune 500 finance firm after a DMAIC clean-up. – GoLeanSixSigma.com (GLSS)

Lean Tools Every Procurement Team Can Use

  1. Value-stream map procure-to-pay — surface waits between request, approval, and PO dispatch.
  2. 5S digital contract folders — one naming rule kills version-hunt time.
  3. Kanban for approval queues — work-in-progress limits prevent pile-ups.
  4. Obeya wall for supplier scorecards — daily visibility on price, quality, delivery.

Six Sigma Methods for Procurement Metrics

MetricWhat to TrackWhy It Helps
PO cycle timeHours/days from approved requisition to PO sentReveals bottlenecks
Cost per POInternal labor + system fees ÷ POsFlags hidden processing cost
Supplier defect rate (PPM)Defects per million partsDirect hit on quality targets (Six Sigma = 3.4 PPM)SixSigma.us
On-time deliverySupplier lines on-time ÷ total linesTies quality work to schedule stability

DMAIC gives each metric a clear path: baseline → root-cause → pilot → control.

Lean Six Sigma in Procurement / Supply Management: Quick Wins and Real Stats

  • Removing two approval layers and parallelising data entry trimmed PO lead time 33 %. – dcmlearning.ie
  • Standardised buyer workflows freed 9 482 hours a year, converting to US $9.6 M quarterly savings. – isixsigma.com
  • A defect-mapping blitz cut inaccurate invoices 94 %, slashing customer queries and credit notes. – GoLeanSixSigma.com (GLSS)

Lean Six Sigma in Procurement / Supply Management: Step-by-Step Start-Up

  1. Pick one pain point — PO cycle time is usually visible and easy to measure.
  2. Map the flow — include every click, queue, and manual check.
  3. Label steps — value-add, required, waste; delete pure waste.
  4. Baseline numbers — days, dollars, defects.
  5. Analyse causes — 5 Whys, Pareto, regression.
  6. Pilot fixes — single commodity or site.
  7. Control — SOPs, dashboards, weekly audits.

Wrap-Up

Lean Six Sigma in Procurement / Supply Management turns slow, tactical buying into a fast, data-driven advantage. Start with one metric, remove waste, reduce variation, lock the gain, repeat.

Lean Six Sigma Yellow Belt Certification Course

Buy Now for $12.99

Udemy prices may vary depending on applied coupons and promotional events.

  • 🧑‍🏫 136 lectures
  • ⌚ 10h 55m total length
  • 🗃️ 31 downloadable resources
  • 📜 Certificate of completion
  • 👩‍🎓 11,951 students
  • ⭐ 4.6 rating by 671 students

Offer ends in:

  • 00Hours
  • 00Minutes
  • 00Seconds
Lean Six Sigma Yellow Belt certification Course
Scroll to Top

Checkout our courses!

Lean Six Sigma Yellow Belt

Robotic Process Automation (RPA)

Business Process Automation

Process Improvement

Continuous Improvement

Root Cause Analysis

Total Quality Management

Enroll now to get up to 80% discount!

Offer ends in:

  • 00
  • 00
  • 00